I desire a position that will provide a challenging opportunity for significantly contributing to a company’s efficiency, organization, growth, and profitability.
To pursue excellence in the dynamic civil engineering field, my skills will able me to capitalize on opportunity and challenge the threats faced by organization thus contributing towards its prosperity.
Working with effect from 2 May, 2018 to till date at DHA Project, site at DHA
Multan Sector-B. The project is based on
Sewerage Works
Storm Water Drains
Water Supply
Roads Work
Overhead Water Tanks
Tube Wells
Electrical Supply
I am performing my duties in a Planning Section as a Planner & Scheduler for
a work program of infrastructure by using Oracle Prima Vera P-6 (R17.7).
Working professionally in a planning department and Maintaining
1. Prepare and update project schedule based on the contract Bill of Quantity.
2. Set work program and target milestones for each phase based on the project plan.
3. Prepares and submit updated work program.
4. Monitor day to day work progress.
5. Maintaining and record update of site work progress in the existing Schedule
Working for one year 2 oct, 2016 to till date at Government National Project,(In Progress)
Project Cost: 880 Million
A joint venture Project of Pakistan Army and Pakistan Atomic Energy Commission (PAEC) site at Pakistan Air Force Base Fareed.
I have performed my duties as a Deputy Project Manager to manage and schedule activities including planning as per required resources.
To measure and monitor progress for actual production of work done.
Communicate with all members of project team and consultant representative on program issues.
Coordinate with the project Manager to produce the work program for portfolio as well as for sub engineers, sub contractors and for different structural element.
Manage the activities other than above is as follows.
Bar bending schedule
Assuring work as per drawing
Material maintenance
Billing of sub contractors for different item of work
Maintain office work documentation
Work on Atomic Energy Building
Work and study on following drawings regarding structure requirement as
• Structure drawing
• Steel drawing
• Plumbing and other services drawing (sewerage, cold water, hot water, vent, fire fighting)
• Penetration and sleeve drawing (DECON, DIESEL, ELECTRICAL, UFMS, FSS, OXYGEN, CENTECH )
• Special purpose Global shielding work drawing
• HVAC drawing
• Special purpose Blast valve drawing
Sub Station Building (Frame Structure) (completed)
project cost: 2.4 Million
part of joint venture program of Pakistan Air Force & Pakistan Atomic Energy Commission
consisting
transformer Room
LT Room
HT Room
VCB Rom
laying of LT & HT cable from sub station to main building supply and fixing accessories, LT Panels, HT panels, generator, UPS System,electrical appliances and fitting was the main work breakdown of internal and external electrification system.